Installation of the TDIS unit for the High-Luminosity LHC

Nearly one year after the start of the assembly activities the first 3-module-device Target Dump Injection Segmented (TDIS) unit is ready to be installed. This time span has allowed the project team to troubleshoot and ultimately validate the equipment assembly procedure and its overall design.

One major milestone achieved during this process was the completion of an irradiation experiment at CERN’s HiRadMat facility in 2018. A complete prototype TDIS module was exposed to several high-intensity proton beam pulses, reproducing in its core (two movable assemblies named jaws) the thermomechanical response expected by HL-LHC beam impacts. As anticipated/expected by previous simulations , the jaw assembly, made up mainly of isostatic graphite absorbing blocks supported by an advanced Titanium-Zirconium-Molybdenum (TZM) stiffener, did not show any beam-induced degradation, which was corroborated by online instrumentation and post-irradiation examinations. The      outstanding strength at high temperatures along with the remarkable thermal conductivity plus an average specific heat make the TZM the most suitable material to cope with the challenging energy level at the TDIS back-stiffener’s spot. That is why it was chosen over many other candidates such as Glidcop® (used in back-stiffeners of most LHC collimators).

The on-line monitoring of the HiRadMat module also provided an insight into the performance of the built-in cooling system, which was able to cool the jaws down to room temperature within about 10-15 minutes after beam shots (when TZM’s temperature exceeded 200°C). The cooling system was subject of another test aiming at evaluating its capacity to keep the jaw temperature below 50°C while beams are being injected into the HL-LHC. During LHC filling, continuous resistive-wall heating of the TDIS jaws is present, mostly on surfaces directly exposed to particle beams. The testing set-up included four 1000-watt lamps to get the jaws heated up in a manner similar to real-time operation.

Further validation tests were conducted on another essential system of the injection absorber: a complex mechanism containing almost 500 components denominated “mechanical table”, responsible of the 0.01 mm-accurate motion of the jaws inside the vacuum chamber. Two mechanical tables endured, without any hint of fatigue/deteriotation, 15000 full-stroke cycles, pessimistically emulating the expected displacements over the TDIS’s lifetime. Moreover, prior to running the mechanical table cycling test, the lubricated lead screws (by far the most sensitive components of this sub-assembly) were gamma irradiated up to 5 MGy, several factors higher compared to the calculated cumulated dose at the TDIS location in the LHC tunnel. Unlike the other testing activities, the irradiation campaign of the leadscrews took place/was performed at BGS Beta-Gamma-Service GmbH (Wiehl, Germany).

As for the assembly procedure of the injection absorber, specific tools and custom-made benches were developed to ease certain critical operations, namely the mounting of jaws - which requires compressing springs that deliver a total force of 3 tons - and the insertion of the assembled jaws into the chamber. For the latter it is necessary a combination of guided translational and rotational movements of the jaw whilst being significantly close to the delicate surfaces of the jaw and the chamber. Failing to perform it correctly could result in collisions between the two components and hence, for instance, in a leaking vacuum tank or a damaged absorbing surface of the jaw.

Time-lapse of the last activities conducted on the TDIS. (Video: CERN)

In terms of the design, the single major modification that the TDIS has undergone in the last year is the reinforcement of the girder that supports the three modules. A truss was added to the structure in order to increase the girder and stiffness and to avoid buckling or torsional deformations that could be produced by axial forces (of approximately 1.5 tons) arising when the device is under vacuum.

Today, the first TDIS unit is going through conditioning to meet ultra-high vacuum specs after successfully passing the rest of the required verifications before installation in point P2 of the LHC. These checks comprise metrological and survey checks and impedance measurements, among others. In parallel, the ongoing assembly of the second unit is planned to finish before the end of August 2020, heading for installation in point P8 by the last quarter of this year. Two additional devices will be constructed and stored as spares, completing the entire TDIS series.

Marco Zanetti (INFN & Univ. Padua), Frank Zimmermann (CERN)
Workshop shines Light on Photon-Beam Interactions
7 Dec 2017

Workshop shines Light on Photon-Beam Interactions

The ARIES Photon Beams 2017 Workshop was held in Padua, Italy in late November 2017.

Mohammed Shahzad (University of Strathclyde)
Laser-wakefield accelerators for High-energy coherent Terahertz radiation
26 Jun 2018

Laser-wakefield accelerators for High-energy coherent Terahertz radiation

Paper just published in New Journal of Physics describes a promising pathway to more efficient radiation sources

Daniela Antonio (CERN)
Power converters specially designed for CERN can now be used by the wider accelerator community
11 Dec 2019

Power converters specially designed for CERN can now be used by the wider accelerator community

CERN has developed new software layers to allow the wider particle accelerator community to use the CERN-specific power converters controls.

Ensuring safer operation at higher luminosities

The TDI (Target Dump Injection) is a beam-intercepting device installed on the two injection lines of the LHC (Large Hadron Collider) to protect the superconducting elements of the machine during injection in case of a malfunction of the injection kickers.

Due to the higher bunch intensities and smaller beam emittances expected in the HiLumi-LHC phase, and following the operational experiences of the TDI, a complete revision of the design has been performed. The result of this reengineering work is the TDIS (Target Dump Injection Segmented),a key element for the safe operation of LHC at high luminosity.   

The major changes that can improve the reliability of this component are:  

  • A more efficient cooling circuit better integrated in the jaw, in order to dissipate the beam induced Radio Frequency (RF) heating.
  • A more robust and reliable motorization system and fixation points to contain and guide any possible deformation.
  • A new geometry with smaller cavities, better contacts and RF fingers to damp as much as possible the HOM.

Several other aspects were taken in consideration while reengineering the TDIS and as the letter “s” indicates, the new design is segmented! The new modular design will simplify the assembly procedure, the installation, the maintenance and will improve the robustness, setup accuracy and operational reliability of the system.

The new injection dump consists of three modules, independently movable, of equal length (each ~1.6 m long) hosting different absorber materials: two modules with low-Z absorbers blocks (graphite R4550) and one with a sandwich of higher-Z materials (Ti6Al4V and CuCr1Zr). A careful choice of the material ensures that no damage occurs in the machine as well as that the TDIS will cope with all direct beam impact conditions. Impedance, e-cloud and radiological aspects were also taken into account in the final design.

After several years of engineering and specification work, the efforts now move to the procurement of materials and components for the assembly of the TDIS prototype. As of today, most of the components required to build-up one TDIS prototype (plus one module for validation purposes at CERN’s HiRadMat testing facilities) are in the manufacturing phase, although some key elements have already been produced. Amongst them, the absorbing blocks and one back-stiffener of a jaw to be installed in the HiRadMat module. This stiffener is a structural component intended to ensure the requested flatness of the jaw’s surface exposed to the beam and is produced out of TZM (Molybdenum alloy) in order to withstand the high thermomechanical loads induced in case of beam impact.

3D view of the HiRadMat module that will be assembled in 2018 along with a full TDIS prototype (Image credit: Luca Gentini). 

Finally, it should be noted that the aforementioned manufactured parts are currently going through the qualification process at CERN. Ultrasonic inspection and metrology analysis are so far completed and the next stage is vacuum testing to confirm the compatibility of the graphite blocks and the TZM back-stiffener with an ultra-high vacuum environment.

The start date for the assembly process of the prototype and the HiRadMat module is planned for early June, right after the arrival of the vacuum vessels.

Daniela Antonio (CERN)
Building on the community’s collective experience on accelerator communication
25 Mar 2020

Building on the community’s collective experience on accelerator communication

Members from the accelerator communication community gathered at CERN for the 2nd Accelerator Communication and Outreach workshop.

Anaïs Schaeffer
Aligning the HL-LHC magnets with interferometry
4 Dec 2019

Aligning the HL-LHC magnets with interferometry

CERN surveyors have developed a procedure based on interferometry to determine the position of cold masses inside the cryostats of the future HL-LHC.

Ruben Garcia Alia (CERN)
RADECS 2017: radiation resistance for electronics
7 Dec 2017

RADECS 2017: radiation resistance for electronics

Addressing radiation effects with RADECS and RADSAGA